Mesta Inc. supplies 60 deg LR bends for controlled directional changes in process piping, pipelines and fabricated pipe assemblies. Buyers can define pipe size, long-radius geometry, material, wall, tangents, ends and inspection scope through a bend schedule or approved drawing.
“LR” means long radius. A 60 deg LR bend turns the pipe centre line through sixty degrees along a broad, drawing-defined radius. It creates an alignment change larger than 10°, 15°, 30° or 45° adjustments and smaller than a 90° turn.
The abbreviation LR describes the bend family, but it does not give the manufacturer every dimension needed for production. The purchaser must identify the centreline radius, pipe outside diameter, wall thickness and any straight tangent at the ends. These values establish the actual envelope of the bend.
Mesta Inc. reviews each enquiry against the drawing, material specification and inspection requirement. If the bend forms part of a pipe assembly, include orientation and end-reference dimensions so it can be coordinated with the connected spool. See our broader LR bend range for other angles and configurations.

An actionable purchase description combines the 60° angle with the pipe and bend data. Using one bend-schedule line for each configuration helps distinguish items that share a nominal size but have different walls, radii, tangents or materials.
| Item identification | Line number, item number, drawing reference and quantity for clear schedule control. |
|---|---|
| Nominal size and OD | DN or NPS together with the applicable dimensional standard and confirmed outside diameter. |
| Nominal wall | Schedule or millimetre wall, plus any project-defined minimum wall after bending. |
| Bend angle | 60 degrees with the permitted positive and negative angular deviation. |
| LR / centreline radius | Exact CLR in millimetres or the approved diameter multiple with its calculation basis. |
| Tangents | Required straight length at each end, measured from the theoretical tangent points. |
| Material specification | Full material standard and grade rather than a generic description such as steel or stainless steel. |
| End condition | Cut length, squareness, bevel angle, root face and protection as applicable to the connection. |
| Inspection package | Required material certificates, dimensional report, examination records and release documents. |
| Delivery condition | Heat treatment, surface condition, coating, marking, packing and destination requirements. |
Ordering note: Avoid specifying only “60 deg LR bend.” Two bends with the same angle and nominal size can have different centreline radii, tangents and overall dimensions. Attach the controlled drawing or completed bend schedule to the enquiry.
The configuration begins at the first tangent point, follows the curved centre line through 60°, and ends at the second tangent point. Any straight extensions lie outside this curved portion. Defining these reference points prevents disputes about where the overall length is measured.
The inlet line establishes the starting direction and the reference from which the sixty-degree turn is measured.
The outlet centre line is rotated 60° from the inlet centre line in the plane identified on the drawing.
The stated CLR controls the curved path. The theoretical centreline arc length equals πR/3 for a 60° angle.
Inlet and outlet tangents should be dimensioned independently when the installer needs extra length for welding or fit-up.
Layout note: Mark the flow direction, bend plane, rotation and item number so fabrication and installation teams can maintain the intended 60° orientation.
Material selection should match the connected pipe, design temperature, design pressure, corrosion allowance, fluid service and governing project specification. Traceability and supplementary testing should be agreed before manufacturing begins.
Carbon steel is widely specified for process, utility, water and pipeline systems. Buyers should state the exact pipe grade, wall and documentation requirement.
Alloy grades may be selected for elevated-temperature or service-specific duties. Heat-treatment and testing requirements must follow the approved specification.
Stainless grades can support corrosion-resistant piping systems. State the precise grade, surface condition, cleanliness and fabrication controls.
When external protection is required, identify the coating system, surface preparation, cutback areas, thickness and inspection criteria.
Material-specific options include carbon steel bends, alloy steel bends, SS 304 bends, SS 316 bends and coated bends.
A controlled enquiry-to-release process helps keep commercial and technical requirements aligned. Mesta Inc. uses the submitted specifications to evaluate feasibility and establish the agreed supply scope.
List every required size, wall, material, CLR, tangent, end detail and quantity with the latest drawing revision.
Clarify missing dimensions, tolerances, material requirements, inspection points and delivery conditions.
Align the quotation with the accepted manufacturing, testing, documentation, coating and packing requirements.
Use approved item numbers and drawing references to maintain identification through production and inspection.
Check the required dimensional and examination records against the purchase-order acceptance criteria.
Apply agreed identification and end protection, then pack the bends for the stated mode and destination.
The required documentation should be stated at enquiry stage because different projects expect different records. Acceptance criteria must come from the purchase order, approved drawing and applicable project specification.
Define the certificate type and traceability information required to connect the supplied bend with its source material.
The report can record angle, CLR, tangents, end dimensions and other agreed checkpoints from the drawing.
When additional examination is specified, identify the method, coverage, procedure, acceptance standard and reporting format.
Agree the document index, marking details, coating records and inspection release requirements before dispatch.
The 60° deflection supports layouts requiring a deliberate and substantial alignment change. The engineering designer must confirm that the radius, material and wall suit the service. Common purchasing contexts include:
Related configurations include pulled bends, flanged-end bends and bends for hydro test.
Send one consolidated technical and commercial package so the quotation can address the complete requirement:
LR means long radius. The bend turns the pipe centre line by 60° along the centreline radius defined in the drawing or bend schedule.
No. The intended radius convention can vary with the product, project and purchaser. State the exact CLR or an unambiguous approved diameter multiple.
Tangents provide straight pipe at the bend ends for cutting, welding, fit-up or dimensional control. They also affect the finished end-to-end envelope.
Yes, when bevelled ends are included in the approved supply scope. The enquiry should define the bevel geometry and applicable welding preparation requirement.
Provide the complete material specification and grade, pipe dimensions, required certificates and any service-specific supplementary requirements.
Yes, subject to technical review. Each schedule line should identify the size, wall, material, angle, CLR, tangents, ends, quantity and drawing reference.
State the required material certificates, dimensional report, examination records, heat-treatment or coating records and release documents in the enquiry.
Send Mesta Inc. your bend schedule, drawings, pipe specification, centreline radius, tangents, end preparation, quantities and document requirements for technical and commercial review.
+91 22 2386 0222 / +91 22 2386 0223 +91 22 67492118 / +91 22 6636 2118 +919820007728 +919867899897 +919819546861
sales@mestainc.com nms@mestainc.com export@mestainc.net
Ground Floor, Shop No.2, Rangawala bldg., 58 Islampura Street, Near Alankar Cinema, Mumbai-400 004, India
Plot No L 85, MIDC Taloja Industrial Area, Dist.Raigad, Navi Mumbai-410 208, India
Powered by Mesta Inc | Designed and Developed by Skytech SEO Solutions